SPECIFIER CENTRE

Specify with clarity.
Build with confidence.

A structured technical library connecting product data, specifications, environmental information, installation, care, handling and warranty.

02
Current document
revisions only

TECHNICAL LIBRARY

Choose the document you need.

The full document list is visible below. Public documents will offer View Online and Download when their approved website PDF files are in place. CSI specifications, Product Environmental Data (PEDs), and the separate Handling & Shipping / Storage Policy are available by request.

PUBLIC · PDS · 10/2025

Metallic Bonded Product Data Sheet

Product characteristics, colours, patterns, thicknesses and sheet sizes.

PUBLIC · PDS · 10/2025

Crystal-Quartz Bonded Product Data Sheet

Product characteristics, colours, patterns, thicknesses and sheet sizes.

REQUEST · CSI · 01/2026

Metallic Bonded CSI Specification

Current specification language and execution requirements.

REQUEST · CSI · 01/2026

Crystal-Quartz Bonded CSI Specification

Current specification language and execution requirements.

REQUEST · PED · 2025

Metallic Bonded Product Environmental Data

Product-specific environmental and material information.

REQUEST · PED · 2025

Crystal-Quartz Bonded Product Environmental Data

Product-specific environmental and material information.

PUBLIC · REVISION TO CONFIRM

Installation Guide

Installation guidance, substrate and assembly considerations.

PUBLIC · SOURCE 01/2024 · CONFIRM CURRENT

Care & Maintenance

Routine cleaning and maintenance guidance.

REQUEST · POLICY · REVISION TO BE CONFIRMED

Handling & Shipping / Storage Policy

Request the separate policy document covering packaging, shipping, handling, storage and protection.

PUBLIC · 01/2026

15-Year Product Warranty Policy

Warranty coverage, exclusions and claim requirements.

PUBLIC · 2025

Custom Surfaces Development Policy

Drawing, sample, mould and production development framework.

REQUEST FORM

Request restricted technical documents.

All contact and project fields are required. The website will prepare a completed request-form file for you to attach to your email. Your email application opens with the recipient and request details; you must attach the downloaded form and press Send.

This static website does not transmit or store your details on submission. It creates a local form attachment and opens your email application for you to send.

SPECIFIER WORKFLOW

Move from material selection to project specification.

The Specifier Centre is the technical handoff after material and pattern discovery: identify the Surface Family, Pattern Name, material / finish or colour, application and required document set before requesting project-specific confirmation.

01

Identify the surface

Start with Metallic Bonded or Crystal-Quartz Bonded, then select the Pattern Name and documented material / finish or standard colour.

02

Confirm the application

Match the selected surface to the architectural application and confirm fabrication, installation and performance requirements for the project.

DOCUMENT ACCESS

Current documents, controlled access.

Publish only the approved public PDFs, with document title, revision/date and applicable surface family visible. Public documents offer in-browser viewing and download. The two CSI specifications, two PEDs and separate Handling & Shipping / Storage Policy are request-only. Superseded documents must never remain publicly linked.

01

Public and request-only resources

PDS, Installation Guide, Care & Maintenance, Handling & Shipping / Storage, Warranty and Custom Surfaces Development are classified as public. Only the two CSI specifications and two PEDs are request-only. Website PDF paths must point to the exact approved source files.

02

Revision discipline

Superseded documents should never remain publicly linked. Each published document should show its revision/date and surface family where applicable.

SPECIFICATION PRINCIPLES

Technical information should be current, traceable and project-relevant.

01

Current revisions

Always use the current published document revision for project specification and submittals.

02

Application-specific qualification

Assembly, backing, installation and performance requirements should be confirmed for the intended application.

REQUEST DOCUMENTS

Tell us what you need to specify.

Request a PDS, CSI specification, PED, installation or care document, or ask a technical question about a project.

Request Technical Information